More Power

Work started on the electrical outlet additions. The “old work” boxes have templates but after measuring the location of a few, a template cut from a pizza box lid will ensure they are all the same height from the floor and speed things along. The wiring for the downstairs will be simple, as a hole drilled through the joist to the crawl space will work just fine.

No comments: